Execution of civil works of Road bed and bridges for 3rd line of track between Gotlam (Incl) (KM459.840) - Vizianagaram (Inc)(KM 818.65 on HWH VSKP Main Line) for a length of 6 KM and Construction of New Single Line BG track, ByPass Line between Gotlam and Nellimarla (8.035km), involving Construction of Roadbed and bridge works between Gotlam (Excl) (KM 461.252) - Nellimarla Junction cabin (KM 812/6-8 on HWH-VSKP Main Line) in Waltair Division of East Coast Railway, Andhra Pradesh state, India.
Construction of misc works such as improvement of cutting and banks improvement to drainage of track and subways, protection works, provision of subways and its approaches etc. in between Marwasgram - Singrauli in connection with Katni - Singrauli Doubling Project.
Construction of Side Drain, Central Drain, Toe walls, retaining walls, other protection works and miscellaneous works in Between New Katni Jn. To Beohari Station and MWJ-JOBA in connection with Katni-Singrauli Doubling Project of WCR.
Fencing works- Provision of safety fencing i.e Double W beam & knot fencing along the track for running of trains above 110 KMPH to arrest tress passing on RV line under the jurisdiction of ADEN/VZM.Â