Earthwork in filling in embankment, provision of blanketing material, Construction/Extension of minor bridges, Limited height subways (LHS),drains and retaining walls, level crossing & gate lodge in the stretch from Marwasgram station to Singrauli station, both inclusive, in connection with construction of doubling of Railway line in between Katni-Singrauli of West Central Railway.
Construction of Central drain-cum-retaining walls on diverted alignment and approaches of New Bridge No.1177/3(Elephant Underpass) being constructed as part of mitigation measures in connection with Commissioning of VST-CTJ-BEHR (30.10 Km) Section of Katni Singrauli Rail Doubling Project.
Development of Wharf Area in GWCB Coal Siding at Gondawali Station in connection with Katni Singrauli Rail Doubling Project under W.C.R (M.P) .
Earth work/ Bridge work and Permanent Way Work of Railway Siding for Wagon Tippler at Village Nigrie, Dist: Singrauli, Madhya Pradesh.
Facility development in Bits Pilani , Hyderabad Campus.
Execution of Civil works between Gajapathinagaram (Excl) Km. 444.303 Gotlam (Incl) Km.462.255 in Andhra Pradesh for the work of “3rd Line between Jimidipeta (Km. 356.518) – Gotlam (Km. 462.255) On Waltair Division of ECoR.